Cepavdue – ENI High Speed Consortium
Location
Brescia – Verona
Value of works
€ 123.504.006,29
Start Date
2021-2024

AV/AC railway line Brescia Est - Verona

The new HS/HC Brescia East – Verona railway line runs for about 48 km, crossing 2 Regions, 3 Provinces and 11 Municipalities mostly alongside the existing infrastructures in the area, starting its route in the municipality of Mazzano (Brescia), until it reaches the municipality of Verona on the western side with the new HS tracks and the new interconnection of Verona Merci.


Share
Manelli Impresa: Realizzazione Linea Ferroviaria Milano-Verona

Project Details

The railway route crosses 2 regions, 3 provinces, 11 municipalities and runs mostly alongside existing infrastructure in the area, about 30 km parallel to the A4 motorway and about 8 km in alignment with the railway line.
The works are located in the municipalities of Mazzano, Calcinato and Lonato del Garda, all in the province of Brescia.

Manelli Impresa: Realizzazione Linea Ferroviaria Milano-Verona

From the beginning of the route in Mazzano, in the province of Brescia, the new railway separates, with a new junction, from the conventional Milan-Venice railway line, running alongside it for about 2 km.
This is followed by the section running parallel to the north of the A4 Milan-Venice motorway at the Chiese viaduct, which overlaps the river itself, in the municipality of Calcinato (BS).

Main interventions

– Noise barrier foundations
– Railway embankments and trenches
– Artificial tunnels (including embankments of natural tunnels)
– Railway and road viaducts
– Cycling and pedestrian subways
– Road works interfered by the high-speed/high-capacity line and related works
– Hydraulic works for water collection and disposal
– Minor works
– Monitoring

Sustainability

The line will make it possible to reduce interference between different transport flows, making traffic flow smoother and increasing traffic capacity at the Brescia and Verona railway junctions, with important benefits for the regularity and punctuality of both long-distance and regional services, as well as freight transport.

All this will have an important environmental impact as sustainable mobility will be promoted and improved, considering that trains will be able to travel at a speed of 250km/h and more than 150km will be covered in total.

Technical Data

48 Km
length of the HS/HC line
2 Regions
operations area
6,6 Km
natural tunnels

Related Projects

Iscriviti alla nostra newsletter

Error: Contact form not found.

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
post
careers
projects