The intervention is aimed at the construction of the network for the collection, discharge and treatment of rainwater in the common areas of the port and the water and sewage network in the eastern area of the port of Taranto.
Group
PROFILE
CORPORATE RESOURCES
Projects
Governance
Business Areas
Sustainability
Careers
Works in progress
The intervention is aimed at the construction of the network for the collection, discharge and treatment of rainwater in the common areas of the port and the water and sewage network in the eastern area of the port of Taranto.
The interventions include: construction of a system for the collection, treatment and discharge of rainwater falling on the free state-owned areas (paved or asphalted) of the territorial district of the Port System Authority of the Ionian Sea – Port of Taranto; construction of the sewerage system in the eastern area of the Port of Taranto. The intervention involves network projects involving excavations to a maximum depth of 5 metres for the laying of underground pipelines and 4 metres for the tank inside the vacum room.
– Construction of a system for the collection, treatment and discharge of rainwater falling on the free state-owned areas (paved or asphalted)
– Construction of the sewerage system in the eastern area of the Port of Taranto
– Network projects involving excavations to a maximum depth of 5 metres for the laying of underground pipelines and 4 metres for the tank inside the vacum room









Iscriviti alla nostra newsletter
Error: Contact form not found.