Building works and installations related to the project “Energy efficiency of the Dr. Alexandru Simionescu Hunedoara Municipal Hospital”.
Work is planned on the thermal power plant with the replacement of the 2 hot water boilers with new boilers, one of which is a pellet boiler, including their burners, and the replacement of the existing steam boilers with a new boiler.
– Opaque façade thermosystem
– Glazed façade thermosystem
– Underfloor heating system above the technical duct
– Terrace heat insulation
– Terrace hydro-insulation
– Electrical lighting system: replacement of electrical paths and lighting fixtures
– Sanitary installations: replacement of sanitary fixtures, hot water sanitary installation, water heating installation with solar panels
– Heating installations: heating system flushing and realisation of heating system distribution network
– Interior finishes (dismantling walls, floors, interior carpentry, staircase coverings, ceiling finishes, wall and floor finishes, interior doors, stairs)
– Sanitary installations: replacement of sanitary fixtures, cold water sanitary installation
– Façade air conditioning installations
– Interior finishes
– Fire detection systems
– Fire extinguishing system
– Fume extraction system
– Technological equipment (fire detection panel, UPS, fans, electric panel pumping unit and smoke suction)






A photovoltaic power plant will be built in order to make the hospital energy efficient by incorporating some alternative energy resources.