Autostrade per l’Italia
Location
Udine (UD)
Value of works
€ 10.023.304,00
Start Date
2021

Motorway maintenance in Udine

The work relates to the repair of the defects found on nine overpasses located on the A27 Venice-Belluno motorway section and more precisely from km 001+884 to km 021+537 and to the upgrading of the safety barriers on the bridge edge and side edge, located on both crowning kerbs and on the starting ramps of flyover no. 6, located at km 007+312 of the A27 Venice-Belluno motorway section. The section of motorway that is the subject of the intervention falls under the jurisdiction of the 9th Section Directorate (Udine) based in S.S. 13 at km 134+100, Tavagnacco (UD).


Share
Manelli Impresa: Manutenzione delle opere d’arte Tronco Udine - Lotto n. 9

Project Details

The section of motorway that is the subject of the intervention falls under the jurisdiction of the 9th Section Directorate (Udine) based in S.S. 13 at km 134+100, Tavagnacco (UD).
The works concern the upgrading of the structures that make up the flyovers listed above and the design of the upgrading of the safety devices present only on Flyover no. 06.

The works will be carried out on the motorway and on the open road, on flyovers consisting of a single carriageway with two-way traffic, mainly away from residential areas and production facilities, and bypassing the A27 motorway, which in the sections in question consists of two carriageways, each with three lanes for traffic and an emergency lane. The flyover decks overlap the two motorway carriageways either perpendicularly or at an angle of 15°.

Main interventions

– Upgrading of the safety barriers on the bridge edge
– Upgrading of the safety barriers on the side edge
– Upgrading of the structures comprising the flyover works and the design of the safety devices

Related Projects

Iscriviti alla nostra newsletter

Error: Contact form not found.

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
post
careers
projects