Governance

Our governance reflects the core values upon which our company is built and the practices we adopt to ensure the success and protection of the interests of all our stakeholders.

Business Areas

Skills, innovation and sustainability are indispensable ingredients for achieving results in our business areas: Infrastructure, Public Building and Private Construction.

Sustainability

Environmental sustainability and land preservation.

Careers

Join our team and inspire others with your professionalism.
Client
ANAS SPA
Location
Capoterra (CA)
Value of works
€ 9.886.085,04
Start Date
2021-2023

Demolition and reconstruction of bridges

The project involves the demolition and reconstruction of the bridges over the Rio San Girolamo (new span 132 m) and the Rio Masone Ollastu (new span 41 m), at km 12+650 and 13+250, respectively, of the Strada Statale 195 ‘Sulcitana’ in the municipality of Capoterra (CA), one of the most important roads in Southern Sardinia, and the plano-altimetrical connection of the intermediate road section, consisting of a single two-lane carriageway.


Share
Manelli Impresa: Demolizione e ricostruzione dei ponti in corrispondenza del Rio San Girolamo e del Rio Masone Ollastu - Capoterra

Project Details

These works are part of the overall hydraulic arrangement of the Rio S. Girolamo and Rio Masone Ollastu, affected by the flood event of October 2008, carried out by the Autonomous Region of Sardinia in order to make them safe by channelling them from upstream to the mouth. The reconstruction of the bridges on the SS195, which span the two rivers near the mouth, is necessary to adapt them to the updated constraints of span and freeboard imposed by the new hydraulic compatibility study drawn up by the Region of Sardinia for the overall work of fixing and securing the area affected by the two river courses.

In addition to the two new bridges, two hydraulic box culverts, seven reinforced concrete walls, an open channel with a length of 230 metres and a span of 7 metres, approximately 1,500 metres of new type C roadway with raising of the level by approximately 4 metres and the inclusion of three new roundabouts, and approximately 1,000 metres of new roadway for local traffic will be built.

Main interventions

– Reconstruction of two bridges
– Construction of two hydraulic box culverts
– Seven reinforced concrete walls
– An open channel with a length of 230 metres and a span of 7 metres, approximately 1,500 metres of new type C roadway with raising of the level by approximately 4 metres
– Inclusion of three new roundabouts, and approximately 1,000 metres of new roadway for local traffic

Related Projects

Iscriviti alla nostra newsletter

Error: Contact form not found.

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors
post
careers
projects